2013 to Current

2022 Village of Longview – Campground Servicing Project

Owner: Village of Longview Engineer: MPE Engineering Supply and install 160 meters of 200mm of sanitary main Supply and install sanitary manholes Supply and install 275 meters of 50mm watermain Supply and install (16) camp site services Road and site restoration with road gravel



Read More

2022 Rocky View Schools – Springbank Schools Wastewater Lagoon Reclamation

Owner: Rocky View Schools Engineer: CIMA+ Decommission existing sewer lagoon site including remove and disposal of existing chain link fencing, interior lagoon piping and control structures Strip existing topsoil off of lagoon walls and stockpile for reclamation of site Level out existing lagoon berms and grade for positive site drainage Import additional topsoil and lay […]



Read More

2022 Town of High River – 4th Ave SE – Street Replacement Program

Owner: Town of High River Engineer: MPE Engineering Remove and replace 320 meters of 200mm watermain Remove and replace 310 meters of 200mm sanitary main Remove and replace water and sanitary services up to property line Remove and replace 370 meters of curb and gutter Remove and replace 200 meters of monolithic sidewalk 3,200 m2 […]



Read More

2021 Town of Turner Valley – Sunset Boulevard Infrastructure Replacement

Owner: Town of Turner Valley Engineer: MPE Engineering Supply and install 1,020 meters of 200mm sanitary main Supply and install (22) sanitary and storm manholes Supply and install 110 meters of 150mm water main Total storm main 765 meters (375mm to 1200mm) Total base gravels and asphalt 12,000 m2 Remove and replace water and sanitary […]



Read More

2020 Doug Price – Rimrock Feeders – Feedlot Rebuild

Owner: Doug Price Engineer: N/A Install new 8” HDPE feeder main Install 24,000 meters of 2” water service piping to new cattle pens Custom aggregate crushing Rebuild of existing raw-water pump house Install custom header units for individual waterer control Earthworks to level and reshape pens, including moving ~80,000 m3 of soils Import, level and […]



Read More

2020 Doug Price – Korova Feeders – Feedlot Rebuild

Owner: Doug Price Engineer: N/A Excavate, shape and fill temporary water storage pond for feed cattle Fuse 2,400 meters of 8” HDPE pipe for permanent intake at creek Excavate and install 8” HDPE pipe including various utility crossings such as Ember Resources, Mountain View County Roads, and CPR Railway tracks



Read More