2022 Rocky View Schools – Springbank Schools Wastewater Lagoon Reclamation

Owner: Rocky View Schools
Engineer: CIMA+

  • Decommission existing sewer lagoon site including remove and disposal of existing chain link fencing, interior lagoon piping and control structures
  • Strip existing topsoil off of lagoon walls and stockpile for reclamation of site
  • Level out existing lagoon berms and grade for positive site drainage
  • Import additional topsoil and lay out stockpiled topsoil over reclaimed area
  • Apply hydro mulch to reclaimed site