Owner: Town of Turner Valley
Engineer: MPE Engineering
- Supply and install 1,020 meters of 200mm sanitary main
- Supply and install (22) sanitary and storm manholes
- Supply and install 110 meters of 150mm water main
- Total storm main 765 meters (375mm to 1200mm)
- Total base gravels and asphalt 12,000 m2
- Remove and replace water and sanitary services up to property line
