Raw Water Pump House, 2014

Owner: Wheatland County

Engineer: BSEI Municipal Consulting Engineers

  • Build 0.5km access road to site
  • Site works including stripping, culverts, topsoil and seeding
  • Excavate and install 12” steel raw water piping with flow meter
  • Construct building to house all mechanical and electrical equipment
  • Install standby generator
  • Install power and control cables from wells to building