Wastewater Stabilization Pond, 2011

Owner: Village of Longview

Engineer: MPE Engineering Ltd, Calgary

-Build new Storage Cell and Facultative Cell

-prepare and line cells with HDPE liner

-Install inlet, control and transfer structures at lagoon site

-Install control valves

-Directional drill installation of 10” Force main from town to lagoon site

-Directional drill installation of 12”gravity drain line from lagoon to outfall into Highwood River

-Install new lift station & generator building

-Re-grade gravity sanitary mains to flow to new lift station

-landscape, topsoil and seed both sites

-Work with Conoco Phillips and Legacy Oil and Gas to cross 30+ well lines