Sanitary Trunk Main, 2010

Owner: Town of Vulcan

Engineer: BSEI Municipal Consulting Engineers

-Install 7000m of gravity sewer main along right of way to new Sewage Lagoon Site

-Install 51 concrete manholes along trunk sewer main

-Install and underground siphon to take effluent across a creek

-Install steel casing under roads

-jackhammer through bedrock to lay piping

-tie into existing Town system and abandon existing piping

-reclaim farmland and all affected areas to a natural state