Sanitary Sewer Outfall Improvement, 2012

Owner: Town of Trochu

Engineer: Southwell Trapp and Associates Ltd.

-Install 1000m of gravity sewer main to replace existing siphon system

-install 7 concrete manholes along sewer main

-Work with Quicksilver resources to cross gas line

-plug and abandon existing manholes

-landscape, topsoil and seed site

-set up and manage temporary pumping for the complete by-pass of all town sewage for the duration of the project