Langdon Wastewater Stabilization Pond Reclamation, 2013

Owner: Rocky View County

Engineer: Golder Associates Ltd.

-Transfer over 19,000,000 gallons of effluent to a newly constructed Stabilization Pond

-Desludge existing Stabilization Pond

-Remove transfer structures, piping and valves between ponds

-Remove and level out existing berms

-Level out pond bottom