Lagoon Rehabilitation, 2014

Owner: Town of Vulcan

Engineer: BSEI Municipal Consulting Engineers

  • abandon existing sewage lagoon within the Town
  • remove existing piping and concrete structures
  • strip, stockpile and replace existing topsoil
  • remove existing lagoon berms, level site and contour for drainage
  • prepare and seed reclaimed area