-Replace 5 blocks of water and sewer mains along 7th Street

-Install 450mm raw water main to bring water from wells to the water treatment plant

-Replace residential services up to property line

-replace sidewalks and curb

– Supply and place new road base and asphalt

– Dress boulevard with topsoil and finish with sod